25 Copthall Avenue
The IDWe team were pleased to have been contracted by Gerald Eve to complete a pump installation project at the 25 Copthall Avenue, London site.
Works consisted of the removal of redundant pump equipment and replacement with new equipment.
X2 redundant pumps were removed and replaced with the installation of x2 new 150mml chilled pumps.
In order to remove the equipment from the top of the building, IDWe utilised craneage, working closely alongside DSM Contract Lifting Services Ltd.