Replacement Boilers
Location – Erith Sports Centre, Ave Road, Erith, DA8 3AT
Client – Parkwood Leisure & FES
Contract Value – £125,000
The IDWe Ltd’s team were contracted by Parkwood Leisure and FES to replace boilers at Erith Leisure Centre throughout the duration of 6-8 weeks.
Works consisted of the stripping out and removal of redundant equipment with use of a plasma cutter.
Throughout the removal stage of the project, craneage was utilised to remove redundant equipment from the roof and install the new boiler- The redundant equipment was replaced with new Remeha implements.
IDWe Ltd took pride in working closely alongside the client, ensuring bespoke requirement were met, such as working out of hours to enable the continuous operation of the site for staff and the general public.
For more information on IDWe Ltd’s Mechanical Services, please click here.