To replace the motor bearings on the roof extract fan
Client – American Embassy
Site Location –
Nine Elms Lane, London, SW11
Contract Duration –
One morning
Highlights of Services Completed Included –
Firstly, we isolated the electrical supply to the extract fan unit and locked off the supply. Removed all covers and drive belts.
Our skilled engineer then stripped the motor down in place and replaced both the drive end and the non-drive end bearings.
We then reassembled the motor pulleys and drive belts then replaced all the covers.
Lastly, we reinstated the power supply.
Result –
The roof extract fan was tested to ensure it was fully operational.
The site was left clean and tidy with all redundant parts being disposed of at a licensed refuse/recycling facility.
The client was happy the work was completed quickly and efficiently.
~
For more information on IDWe Ltd’s Mechanical Services, click here.
Get a quote, please call 020 8302 7644 or email info@idwe.co.uk
To discover all of our services, please click here.
Want to keep up to date with IDWe Ltd? Follow us on social media: Facebook, Twitter & LinkedIn.