Pipework & New Valves Installed
A case study about Pipework Isolation to install two new valves.
Site Location – Old Admiralty Building, London, SW1
Contract Duration – For one evening/night
Highlights of Services Supplied Included –
Our experienced engineers attended the prestigious site out of hours.
To stop the pipework flow, we carried out eight pipe freezes, four on the LTHW pipe and four on the chilled pipe.
In between the freeze jackets, once the flow had stopped, our engineers cut two new T’s on to the existing LTHW and chilled pipework.
The pipework was then extended inside.
For new servicing, our engineers supplied and installed two new 2.5” Butterfly Valves inside of the building for future use.
The pipework was then allowed to thaw, and we carried out the necessary safety checks.
Result –
Everything was left in good working order.
Our engineers left the site clean and tidy, with all redundant parts being disposed of at a licensed refuse/recycling facility.
The client was happy that in the future they can add a new line.
~