Pipe Freezing Services
Client – Campbell West Mechanical
Site Location – Frimley Park Hospital, Surrey
Contract Duration – Out of hours, from 9pm to late
Highlights of Services Included –
- Our engineers attended the site at 9pm during the week to carry out the works agreed.
- We were asked by our clients to carry out three pipe freezes on 3 inch copper water mains to stop the water flow before our clients carried out their works. This was to save draining down the whole system – which saves time and money.
- Once our clients works had been completed, we allowed the pipe freezes to thaw
- Lastly, we ensured the site was cleared of all pipe freezing equipment and redundant materials.
Result –
- We provided three successful pipework freezes as required.
~
Furthermore, for more information on IDWe Ltd’s Pipe Freezing Services, please click here.
Get a quote, please call 020 8302 7644 or email info@idwe.co.uk